Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

43 unique locations (491 components) - Page 1 of 2

Unit D, Kendale Rd, Scunthorpe DN16 1DT (17 components)
β€’ Gas and/or diesel reciprocating engines.
β€’ New build power station comprised of multiple reciprocating engines.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
β€’ 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ EV charging at residential premises
β€’ Generating Unit 2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Unit 21, West End Industrial Estate, Bruntcliffe Road, Morley, Leeds LS27 0LQ (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Solway Trading Estate, Maryport, Cumbria CA15 8NF (9 components)
β€’ New build power station comprised of multiple reciprocating engines.
β€’ The CMU component is an aggregation of turn-down and onsite generation
Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Sherburn in Elmet, Leeds LS25 6JG (7 components)
β€’ Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
β€’ New build power station comprised of multiple reciprocating engines.
Inactive β€’ 2020-21 (T-4), 2018-19 (T-1)
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (26 components)
β€’ 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
74.45 MW
Prospect Park, Grangefield Industrial Estate, Richardshaw Road, Pudsey, Leeds, LS28 6LF (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (2 components)
β€’ Load curtailment and standby generation
β€’ New build power station comprised of multiple reciprocating engines.
Inactive β€’ 2018-19 (T-1), 2017-18 (T-1)
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Orchardbank Business Park, Forfar, Angus, Dundee, Scotland, DD8 1WG (5 components)
β€’ CMU consisting of multiple reciprocating engines and alternators
β€’ New build power station comprised of multiple reciprocating engines.
Inactive β€’ 2023-24 (T-4), 2021-22 (T-4) ...
New Droppingwell Road, Rotherham, S61 2DL (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2018-19 (T-1)
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Meadowfield Industrial Estate, Meadowfield, Durham, DH7 8RL (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
β€’ New build power station comprised of multiple reciprocating engines.
β€’ On-site existing CHP generating unit
Inactive β€’ 2022-23 (T-3), 2021-22 (T-4) ...
Land East and South East of Dunton Hall Kingsbury Road Lea Marston North Warwickshire B76 0DH (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components)
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
β€’ Battery Storage Plant
β€’ New build power station comprised of multiple reciprocating engines.
Active β€’ 2025-26 (T-1), 2022-23 (T-3) ...
40.73 MW
Land at Lutterworth Road, Whetstone LE8 6NB (11 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (9 components)
β€’ A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
β€’ A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
β€’ Combined Cycle Gas Turbine plant
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5480.84 MW
Hurst Way, Northorpe, Mirfield, Lower Hopton, WF14 8LX (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4)
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (5 components)
β€’ Existing CCGT to be refurbished
β€’ New build power station comprised of multiple reciprocating engines.
β€’ Power station comprised of multiple reciprocating engines.
Active β€’ 2028-29 (T-4), 2019-20 (T-1) ...
2.83 MW
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (5 components)
β€’ Gas and/or diesel reciprocating engines.
β€’ New build power station comprised of multiple reciprocating engines.
β€’ Power station comprised of multiple reciprocating engines.
Inactive β€’ 2020-21 (T-4), 2019-20 (T-1) ...
Hanover Pl, Sunderland SR4 6BY (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Halfway Industrial Estate, Halfway, Sheffield, S20 3GZ (16 components)
β€’ Load reduction
β€’ New build power station comprised of multiple reciprocating engines.
β€’ The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
β€’ 6 x reciprocating engines
β€’ A Battery Energy Storage System.
Active β€’ 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations