OCGT and Reciprocating Engines (Fuel Type - Gas)

10 unique locations (70 components)

Wordsworth Crushing Limited, Whaley Road, Barugh, Barnsley S75 1FJ (1 component)

The CMU Component will be made up of gas fired engines.

Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (12 components)
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND OFF HELEN STREET, GLASGOW, G52 1EE (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2021-22 (T-4)
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (12 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ex Gas Holder, Moor Lane, Nottage, Bridgend, CF36 3EJ (5 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-4) ...
9.16 MW
Chemistry Lane, Interlinq Trade Park, Queensfery, Flintshire, CH5 2DW (9 components)
• 14 MW power plant comprising 7 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 14 MW power plant comprising of 7 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. The site is currently going through commissioning activities and only has metered data for 2MW, therefore the company is prequalifying 2MW of existing capacity.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Budds Plantation Paices Hill Aldermaston RG7 4PJ (7 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.99 MW