Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

39 unique locations (899 components) - Page 1 of 2

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
β€’ West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
β€’ West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
β€’ West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
β€’ A gas engine CHP site providing hot water to a local district heating network
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ One CHP engine in a horticultural environment with no auxilliary load.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
β€’ A generating station consisting on multiple reciprocating engines and alternators located on a single site
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
β€’ Standby generation
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Vacant land off Middleton Road, Morecambe, Lancaster, LA3 3NT (2 components)
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ Load reduction
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (6 components)
β€’ Gas fire generating unit
β€’ One CHP engine in a horticultural environment with no auxilliary load.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-3), 2021-22 (T-4) ...
SynTech Energy Centre Ltd Portway Road Wednesbury WS10 7DZ West Midlands (3 components)
β€’ CHP at a water treatment works in Glasgow.
β€’ Deutz Gas Engine Dual fuel SynGas / Mains Gas
Active β€’ 2025-26 (T-4), 2018-19 (T-1)
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
β€’ Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Saltend Lane, HULL, HU12 8PP (33 components)
β€’ Load reduction
β€’ Load reduction on site
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
β€’ 1 x hydro turbine & synchronous generator
β€’ 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
β€’ one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Private Road No.5, Colwick, Nottingham, NG4 2JU *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
β€’ 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
β€’ New reciprocating genset in acoustic enclosure
Inactive β€’ 2020-21 (T-4), 2018-19 (T-1)
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (2 components)
β€’ Load curtailment and standby generation
β€’ New build power station comprised of multiple reciprocating engines.
Inactive β€’ 2018-19 (T-1), 2017-18 (T-1)
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ Ratcliffe Unit 3 coal-fired unit
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
β€’ Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
β€’ New reciprocating gensets in acoustic enclosure
β€’ The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
Land to west of Grange Lane Brinsworth Rotherham S60 1FG (2 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive β€’ 2022-23 (T-3), 2021-22 (T-4)
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
β€’ Battery energy storage unit
β€’ CHP at a horticultural environment.
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (15 components)
β€’ BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
β€’ Lithium Ion battery storage system capable of importing, storing and exporting electricity.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2026-27 (T-4), 2021-22 (T-4) ...
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (34 components)
β€’ A Battery Energy Storage System.
β€’ Combined Heat and Power Plant Olympic Park London
β€’ Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (12 components)
β€’ Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
β€’ Gas reciprocating engines
β€’ Ratcliffe Unit 4 coal-fired unit
Inactive β€’ 2023-24 (T-4), 2021-22 (T-4) ...
Halfway Industrial Estate, Halfway, Sheffield, S20 3GZ (16 components)
β€’ Load reduction
β€’ New build power station comprised of multiple reciprocating engines.
β€’ The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (13 components)
β€’ BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
β€’ Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
β€’ Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
382.93 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
β€’ Genset 2.
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)
β€’ 3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
β€’ Gas fired reciprocating engines.
Active β€’ 2024-25 (T-4), 2021-22 (T-4)
Loading map...
Showing 25 locations