Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

12 unique locations (300 components)

Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
β€’ Generating Unit 1
β€’ ROCable hydro units within the BMU are not included in the CMU.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
β€’ 49.900MW/49.900MWh battery storage asset, 1 hour duration
β€’ Gas fired CHP unit
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
β€’ 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
β€’ Lithium ion battery storage plant
β€’ SolarPV generating station
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (34 components)
β€’ A Battery Energy Storage System.
β€’ Combined Heat and Power Plant Olympic Park London
β€’ Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Heol Ty Newydd Cross Hands Food Park, Cross Hands, Llanelli, SA14 6RF, United Kingdom (22 components)
β€’ Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
47.52 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
β€’ Generating Unit 2
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
β€’ Site with behind the meter diesel generation - offsetting site load and exporting surplus.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
β€’ Hamms Hall - Existing Site CHP
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ existing CHP on site
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
β€’ Existing OCGT
β€’ New build power station comprised of multiple reciprocating engines.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2023-24 (T-4) ...
83.72 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
β€’ 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
β€’ New build transmission connected battery storage site
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 12 locations