Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

57 unique locations (1548 components) - Page 1 of 3

Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (21 components)
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ CMU consisting of multiple gas reciprocating engines and alternators
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
29.17 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom (21 components)
β€’ A gas fuelled generating station.
β€’ Existing CCGT
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8.16 MW
Water Orton, Birmingham, B46 1NU See attached location note (2 components)
β€’ Gas fired reciprocating engines.
β€’ Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Active β€’ 2024-25 (T-4), 2021-22 (T-4)
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
β€’ A generating station consisting on multiple reciprocating engines and alternators located on a single site
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
β€’ Standby generation
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
β€’ Generating Unit 1
β€’ ROCable hydro units within the BMU are not included in the CMU.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
β€’ Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
β€’ Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
β€’ Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (15 components)
β€’ 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
β€’ 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
44.63 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
β€’ 49.900MW/49.900MWh battery storage asset, 1 hour duration
β€’ Gas fired CHP unit
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
β€’ Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)
β€’ Gas fuelled CHP generation plant
β€’ Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Gas Oil as specified by BS2869 Class A2
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
14.60 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (9 components)
β€’ BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
β€’ Gas reciprocating engines.
β€’ Natural Gas fired CHP unit at Halton General Hospital, Hospital Way, Runcorn, Cheshire WA7 2DA
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
1.18 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (14 components)
β€’ Existing CCGT Unit
β€’ Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
773.08 MW
Saltend Lane, HULL, HU12 8PP (33 components)
β€’ Load reduction
β€’ Load reduction on site
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (26 components)
β€’ 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
74.45 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
β€’ 1 x hydro turbine & synchronous generator
β€’ 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
β€’ one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
β€’ Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
β€’ OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
β€’ OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
β€’ Aggregate CMU from multiple sources
β€’ BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (3 components)
β€’ 9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate
β€’ CHP unit
β€’ Gas reciprocating engines
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
2.00 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ Ratcliffe Unit 3 coal-fired unit
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
843.16 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (7 components)
β€’ A new build 19MW battery energy storage system
β€’ A new build 20MW battery energy storage system
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active β€’ 2026-27 (T-4), 2024-25 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Loading map...
Showing 25 locations