OCGT and Reciprocating Engines (Fuel Type - Gas)

6 unique locations (133 components)

WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)
• An energy from waste facility located in North Wales and designed to generate electricity
• Enfield CCGT Power Station - (one unit station)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
30.12 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW