Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

8 unique locations (126 components)

Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (6 components)
• 3.6MW of demand reduction
• Gas generating unit(s)
• NEW BUILD GAS GENERATION STATION
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (9 components)
• CHP Unit
• Gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (20 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• New build power station comprised of multiple reciprocating engines.
• Unit 4 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (12 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
19.60 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (9 components)
• A New Build 14MW Gas Fuelled Generating Station.
• Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.24 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 8 locations