OCGT and Reciprocating Engines (Fuel Type - Gas)

9 unique locations (87 components)

Prospect House Sandycroft Deeside CH5 2QJ (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (6 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-1) ...
3.19 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (12 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.31 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (17 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.78 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (5 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (3 components)
• Gas reciprocating engines (2)
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.52 MW
Anchor Lane Abbess Roding Ongar CM5 0JR (12 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
32.33 MW
Anchor Lane Abbess Roding Ongar CM5 0JR (5 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-1), 2021-22 (T-4) ...
13.31 MW
Loading map...
Showing 9 locations