Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

46 unique locations (443 components) - Page 1 of 2

Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (25 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas fired generating unit
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (11 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (7 components)
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (16 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.77 MW
Prospect House Sandycroft Deeside CH5 2QJ (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (8 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Old Mill Industrial Estate, Mansfield, NG19 9BG (10 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Newton Aycliffe CO Durham DL5 6EA (6 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-1) ...
3.19 MW
Newmarket Lane, Stanley, Near Wakefield, WF3 4BY (21 components)
• 1 X 1.35MW MWM TBG 620V 16K
• Gas fired generating units
• Gas fired reciprocating engines
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
M65, Accrington BB5 5WE (8 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (8 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
18.96 MW
Land off Skinner Lane, Pontefract, WF8 1HG (20 components)
• 1 x 1.550MW MWM TCG 2020
• Gas fired generating unit
• Gas fired reciprocating engines
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (4 components)

NEW BUILD GAS GENERATION STATION

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
J3 Business Park, Balby Carr Bank, Balby, Doncaster, DN4 8DE (9 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (6 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (4 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Harts Farm Way, Havant, PO9 1HS (5 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.04 MW
Loading map...
Showing 25 locations