Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

136 unique locations (386 components) - Page 6 of 6

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
Balle Street, Darwen, Lancashire BB3 2AZ (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 130 LTD New Build Generating CMU Balle Rejected BB3
Inactive • 2021-22 (T-4)
18.96 MW
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (2 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
OCGT and Reciprocating Engines ATTUNE ENERGY LIMITED Existing Generating CMU Plymouth A Plymouth A PL5
Inactive • 2018-19 (T-1), 2017-18 (T-1)
38.01 MW
Askern 1, CMM Generation, Campsall Road, Askern, Doncaster, DN6 0BZ (3 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
23.52 MW
Ashton Old Road, Manchester, Greater Manchester, M11 1AA (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines ASHTON POWER LIMITED New Build Generating CMU Ashton Rejected M11
Inactive • 2021-22 (T-4)
15.17 MW
Amy Johnson Way, Blackpool, FY4 2RP (5 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
7.11 MW
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Storage OCGT and Reciprocating Engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon Rejected FY6
Inactive • 2021-22 (T-4)
15.30 MW
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Bristol Energy Bristol Energy +1 more BS34
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
120.44 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive • 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (4 components)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
75.66 MW
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (4 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
60.31 MW
25 Southfield, Lingard Lane, Stockport, SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
37.99 MW
Loading map...
Showing 11 locations