Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

137 unique locations (388 components) - Page 5 of 6

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
Former Techboard Site. Rassau Industrial Estate, Rassau, Ebbw Vale NP23 5SD (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export. (2)

OCGT and Reciprocating Engines BRECON POWER LTD New Build Generating CMU Brecon Power Brecon Power NP23
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Ferndale Park, Century Road, Hull HU12 8FB (1 component) Geocoding Needed

New build power station comprising of 20MW reciprocating generators, transformers and associated control room,switch room within a secure fenced compound.

OCGT and Reciprocating Engines Cheshire Generation Company Ltd New Build Generating CMU Ferndale1 Not Prequalified HU12
Inactive • 2021-22 (T-4)
18.96 MW
Factory Lane, Croydon, Surrey, CR0 3LE (4 components) Geocoding Needed

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Reciprocating engines OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Energy Croydon Energy +1 more CR0
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
189.45 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (3 components) Geocoding Needed
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.
OCGT and Reciprocating Engines BALANCE POWER LIMITED New Build Generating CMU Ipswich 2 Ipswich Docks A
Inactive • 2021-22 (T-4), 2018-19 (T-1)
37.92 MW
Ecclesfield 35 Industrial Estate, Station Road, Sheffield, South Yourkshire, S35 9YR (3 components) Geocoding Needed
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
OCGT and Reciprocating Engines Peak Power Connections Limited New Build Generating CMU ECCL01 Not Prequalified S35
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
56.73 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components) Geocoding Needed

The CMU is a new reciprocating engine based gas fuelled generating unit.

Reciprocating engines OCGT and Reciprocating Engines Sainc Energy Limited New Build Generating CMU DPG-GAS DPG-GAS Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
37.23 MW
Duncombe Road, Bradford, BD8 9RR (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
18.96 MW
Dorehouse Business Park, Sheffield, S13 9LT, BB10 2TN (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
18.96 MW
Dig Gate Lane, Kingsway, Rochdale, OL16 4NR (1 component) Geocoding Needed

New build power station comprised of multiple reciprocating engines

OCGT and Reciprocating Engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Not Prequalified OL16
Inactive • 2021-22 (T-4)
7.49 MW
Daisymere Lane, Buxton Derbyshire SK17 7JW UK (2 components) Geocoding Needed

2.116MW diesel reciprocating engine

OCGT and Reciprocating Engines Buxton Power Limited New Build Generating CMU BUXTON SK17
Inactive • 2018-19 (T-1), 2017-18 (T-1)
31.08 MW
Daisymere Lane Buxton Derbyshire SK17 7JW UK (14 components) Geocoding Needed
• 2.115MW Diesel reciprocating engine
• 2.115MW diesel reciprocating engine
• 2.116MW diesel reciprocating engine
OCGT and Reciprocating Engines Buxton Power Limited New Build Generating CMU BUXTON SK17
Inactive • 2018-19 (T-1), 2017-18 (T-1)
31.08 MW
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (2 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

OCGT and Reciprocating Engines Suncredit Solutions Limited New Build Generating CMU Not Prequalified DA11
Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.74 MW
Croespenmaen, Newport, Caerphilly NP11 3BP, Wales (1 component) Geocoding Needed

The CMU is a new 20MW facility, connected via a COP2 meter at the distribution boundary, with no auxilliary load on site.

Inactive • 2018-19 (T-1)
18.96 MW
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (1 component) Geocoding Needed

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX54 Rejected PE33
Inactive • 2021-22 (T-4)
28.44 MW
Claycliffe Rd, Barnsley, S75 1HS (3 components) Geocoding Needed
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
56.73 MW
Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 148 LTD New Build Generating CMU Whitebirk BB1
Inactive • 2021-22 (T-4)
18.96 MW
Carlton Forest, Blyth Road, Worksop, S81 0TP (2 components) Geocoding Needed
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
Inactive • 2021-22 (T-4)
16.68 MW
Cadeby 1, CMM Generation, Garden Lane, Cadeby, Doncaster, DN5 7SN (5 components) Geocoding Needed
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
39.38 MW
Bristol Avenue, Moor Park, Blackpool, FY2 0LZ (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
19.00 MW
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 121 Ltd New Build Generating CMU Briscoe Not Prequalified M40
Inactive • 2021-22 (T-4)
37.92 MW
Bradford Road, Batley, Kirklees, WF17 6JS (18 components) Geocoding Needed
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Botley Road, Romsey, Southampton, SO51 9DF (1 component) Geocoding Needed

New build power station comprised of multiple reciprocating engines

OCGT and Reciprocating Engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Not Prequalified SO51
Inactive • 2021-22 (T-4)
19.91 MW
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components) Geocoding Needed
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Storage OCGT and Reciprocating Engines ABBEY HEAT AND POWER CO LIMITED Existing Generating CMU New Build Generating CMU AHAP1 AHAP1 Rejected L30
Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.62 MW
Loading map...
Showing 25 locations