Monks Lane Corsham Wiltshire SN13 9PH (1 component)

Diesel or gas generating station.

Inactive • 2018-19 (T-1)
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QW (4 components)
• 8x 1.40MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
Luichart Power Station, by Loch Luichart, Contin, Ross-shire, IV14 9EW (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import capacity of 38MW and export capacity of 49.5MW.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
LPG Cars Ltd Torrington Avenue Tile Hill Coventry CV4 9AP (1 component)

An array of container housed, gas-fired reciprocating engines which drive generators to produce a total export capacity of 20MW. The containerised units will be mounted on concrete pads, within the …

Inactive • 2021-22 (T-4)
Lostock Hollow, Lostock Gralam, Northwich CW9 7PA, UK (2 components)
• 16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (15 components)
• Battery Storage facility
• gas reciprocating engines.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lodge Lane, Haydock WA12 0HH (10 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, SS16 6EB (2 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land to the South of Wolverhampton Penn sub-station, Union Lane, Lower Penn, South Staffordshire, WV5 7JD. (4 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear
• Battery storage plant
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (5 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Land at Ernest Nunn Road, Stowmarket IP14 2AH (6 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Burn Park Farm, Cottingham, HU16 5SB (6 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (3 components)
• Gas engine system capable of exporting electricity.
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (2 components)

Gas engine system capable of exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land Adjacent to Britannia House Dock Road Poulton CH41 1DF (1 component)

10MW Gas Reciprocating Engines envisaged to be made up of multiple modules

Inactive • 2021-22 (T-4)
Land Adjacent to Britannia House Dock Road Poulton CH41 1DF (2 components)
• 10MW Gas Reciprocating Engines envisaged to be made up of multiple modules
• 15MW BESS envisaged to be made up of multiple modules operated at 5MW
Inactive • 2021-22 (T-4)
Land Adjacent Sub Station (Major), Lower Dunton Road, Bulphan, Essex, SP11 9LR (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4)
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (9 components)
• A 10MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Lambley Lane, Gedling, Nottingham NG4 4PB, UK (1 component)

A new build 20MW gas or dual fuel fired generation station for grid support.

Inactive • 2021-22 (T-4)