Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

137 unique locations (388 components) - Page 2 of 6

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
Unit 27A, Orgreave Drive, Dorehouse Ind. Estate, Sheffield, S13 9NR (3 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
7.11 MW
Unit 27A Orgreave Drive Dorehouse Ind. Estate Sheffield S13 9NR (3 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

OCGT and Reciprocating Engines Shovel Ready 10 Limited New Build Generating CMU Orgreave Drive Not Prequalified S13
Inactive • 2021-22 (T-4)
The Sands Leisure Complex, Burnison Road, Scarborough, YO12 6PH (2 components) Geocoding Needed

Two 1.2MW caterpillar generators

OCGT and Reciprocating Engines ABBEY HEAT AND POWER CO LIMITED New Build Generating CMU AHAP1 Rejected YO12
Inactive • 2021-22 (T-4), 2018-19 (T-1)
3.41 MW
The Power House, Commercial Road, Wolverhampton, WV1 3QS (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
18.96 MW
The Power House, 38 Haughton Road, Darlington, DL1 1ST (18 components) Geocoding Needed
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
54.61 MW
Stainburn Road, Great Clifton, Derwent Valley, CA14 1TG (1 component) Geocoding Needed

New build power station comprised of multiple reciprocating engines

OCGT and Reciprocating Engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Not Prequalified CA14
Inactive • 2021-22 (T-4)
5.97 MW
Snape Lane, Doncaster, DN11 8RU (2 components) Geocoding Needed
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
13.30 MW
SHEWALTON QUARRY, SHEWALTON ROAD, IRVINE, KA11 5AW (1 component) Geocoding Needed

Gas reciprocating engines.

OCGT and Reciprocating Engines Malcolm CM 2 Limited New Build Generating CMU Not Prequalified KA11
Inactive • 2021-22 (T-4)
18.54 MW
SHB Hire, Monks Lane, Nursling, SO16 0YE (1 component) Geocoding Needed

New Build. Gas and/or dual fuel generating station.

OCGT and Reciprocating Engines THORNTON ESTATE ENERGY LIMITED New Build Generating CMU Nursling Energy Not Prequalified SO16
Inactive • 2021-22 (T-4)
18.96 MW
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (4 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
45.59 MW
Salmon Fields, Royton, Greater Manchester, OL2 6HT (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 109 Ltd New Build Generating CMU Salmon Not Prequalified OL2
Inactive • 2021-22 (T-4)
18.96 MW
Salford Road, Bolton, Greater Manchester BL5 1DG (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines SALFORD POWER LIMITED New Build Generating CMU Salford Rejected BL5
Inactive • 2021-22 (T-4)
18.96 MW
Saddlebow Road, Saddlebow, King's Lynn, Norfolk, PE34 3AG (1 component) Geocoding Needed

The construction of an peaking plant energy centre, which will house 15 gas engines and may be enhanced in future by battery storage.

OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX53 Rejected PE34
Inactive • 2021-22 (T-4)
46.46 MW
Rounponds Energy Limited, Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components) Geocoding Needed
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
37.83 MW
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (2 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rear of Industrial Estate, Station Road, Sheffield, South Yourkshire, S35 9ZX (1 component) Geocoding Needed

gas reciprocating engines.

OCGT and Reciprocating Engines Peak Power Connections Limited New Build Generating CMU Not Prequalified S35
Inactive • 2021-22 (T-4)
9.27 MW
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands, WS10 0NT (1 component) Geocoding Needed

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1)
19.83 MW
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

OCGT and Reciprocating Engines WEDNESBURY POWER LTD New Build Generating CMU Wednesbury Power WS10
Inactive • 2018-19 (T-1)
Power House Road, Birkenhead, Wirral, CH62 0AZ (2 components) Geocoding Needed
• 20MW Gas Reciprocating Engines envisaged to be made up of multiple modules
• 28MW BESS envisaged to be installed in multiple modules operated at 8MW
Inactive • 2021-22 (T-4)
20.39 MW
Plot 15, Sherburn Rail Freight Terminal, New Lennerton Lane, Leeds, LS25 6LH (2 components) Geocoding Needed

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

Inactive • 2021-22 (T-4), 2018-19 (T-1)
18.77 MW
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (1 component)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

OCGT and Reciprocating Engines SelectGen Limited New Build Generating CMU Selby Plot 15 LS25
Inactive • 2018-19 (T-1)
Plant Yard, Howard Yard, Redditch, B98 7SG (20 components) Geocoding Needed
• 2.115MW Diesel and / or gas dual fuel reciprocating engine
• 2.116mw diesel and / or gas dual fuel reciprocating engine
• 2.116mw diesel and/or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1), 2017-18 (T-1)
40.02 MW
Petre Road, Clayton - Le - Moors, Accrington, BB5 5JG (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 113 LTD New Build Generating CMU Clayton BB5
Inactive • 2021-22 (T-4)
18.96 MW
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (4 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.60 MW
Loading map...
Showing 25 locations