Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

137 unique locations (388 components) - Page 1 of 6

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
25 Southfield, Lingard Lane, Stockport, SK6 2QN (16 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
37.99 MW
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (4 components) Geocoding Needed
β€’ Battery Storage Facility
β€’ Diesel and/or gas reciprocating engines.
β€’ Gas reciprocating engines.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
60.31 MW
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (4 components) Geocoding Needed

A new build gas fuelled generating station.

Inactive β€’ 2020-21 (T-4), 2019-20 (T-1) ...
75.66 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components) Geocoding Needed

Gas generation peaking plant comprising of 9 x 2MW engines

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (3 components) Geocoding Needed

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Bristol Energy Bristol Energy +1 more BS34
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
120.44 MW
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components) Geocoding Needed
β€’ Battery Storage Facilty
β€’ Energy facility comprising of reciprocating engine sets.
Storage OCGT and Reciprocating Engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon Rejected FY6
Inactive β€’ 2021-22 (T-4)
15.30 MW
Amy Johnson Way, Blackpool, FY4 2RP (5 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear

Inactive β€’ 2021-22 (T-4)
7.11 MW
Ashton Old Road, Manchester, Greater Manchester, M11 1AA (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines ASHTON POWER LIMITED New Build Generating CMU Ashton Rejected M11
Inactive β€’ 2021-22 (T-4)
15.17 MW
Askern 1, CMM Generation, Campsall Road, Askern, Doncaster, DN6 0BZ (3 components) Geocoding Needed
β€’ 1x 2.00MW Containerised Generating sets.
β€’ Gas fired generating sets.
Inactive β€’ 2021-22 (T-4), 2016-17 (TR)
23.52 MW
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (2 components) Geocoding Needed
β€’ CMU Component is 500kVA reciprocating diesel engine.
β€’ This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
OCGT and Reciprocating Engines ATTUNE ENERGY LIMITED Existing Generating CMU Plymouth A Plymouth A PL5
Inactive β€’ 2018-19 (T-1), 2017-18 (T-1)
38.01 MW
Balle Street, Darwen, Lancashire BB3 2AZ (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 130 LTD New Build Generating CMU Balle Rejected BB3
Inactive β€’ 2021-22 (T-4)
18.96 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
11.40 MW
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components) Geocoding Needed
β€’ 11MW of 60 minute frequency response, battery storage
β€’ two 1.4MW caterpillar generators
Storage OCGT and Reciprocating Engines ABBEY HEAT AND POWER CO LIMITED Existing Generating CMU New Build Generating CMU AHAP1 AHAP1 Rejected L30
Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
4.62 MW
Botley Road, Romsey, Southampton, SO51 9DF (1 component) Geocoding Needed

New build power station comprised of multiple reciprocating engines

OCGT and Reciprocating Engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Not Prequalified SO51
Inactive β€’ 2021-22 (T-4)
19.91 MW
Bradford Road, Batley, Kirklees, WF17 6JS (18 components) Geocoding Needed
β€’ 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
β€’ 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 121 Ltd New Build Generating CMU Briscoe Not Prequalified M40
Inactive β€’ 2021-22 (T-4)
37.92 MW
Bristol Avenue, Moor Park, Blackpool, FY2 0LZ (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
19.00 MW
Cadeby 1, CMM Generation, Garden Lane, Cadeby, Doncaster, DN5 7SN (5 components) Geocoding Needed
β€’ 1x 2.00MW Containerised Generating sets.
β€’ Gas fired generating sets.
β€’ Gas generating unit(s)
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
39.38 MW
Carlton Forest, Blyth Road, Worksop, S81 0TP (2 components) Geocoding Needed
β€’ A New Build 10MW Fuelled Generating Station.
β€’ A New Build 8MW ACT generating station using a closed loop steam system.
Inactive β€’ 2021-22 (T-4)
16.68 MW
Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component) Geocoding Needed

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 148 LTD New Build Generating CMU Whitebirk BB1
Inactive β€’ 2021-22 (T-4)
18.96 MW
Claycliffe Rd, Barnsley, S75 1HS (3 components) Geocoding Needed
β€’ Diesel and/or gas reciprocating engines.
β€’ gas reciprocating engines.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
56.73 MW
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (1 component) Geocoding Needed

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX54 Rejected PE33
Inactive β€’ 2021-22 (T-4)
28.44 MW
Croespenmaen, Newport, Caerphilly NP11 3BP, Wales (1 component) Geocoding Needed

The CMU is a new 20MW facility, connected via a COP2 meter at the distribution boundary, with no auxilliary load on site.

Inactive β€’ 2018-19 (T-1)
18.96 MW
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (2 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

OCGT and Reciprocating Engines Suncredit Solutions Limited New Build Generating CMU Not Prequalified DA11
Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
4.74 MW
Daisymere Lane Buxton Derbyshire SK17 7JW UK (14 components) Geocoding Needed
β€’ 2.115MW Diesel reciprocating engine
β€’ 2.115MW diesel reciprocating engine
β€’ 2.116MW diesel reciprocating engine
OCGT and Reciprocating Engines Buxton Power Limited New Build Generating CMU BUXTON SK17
Inactive β€’ 2018-19 (T-1), 2017-18 (T-1)
31.08 MW
Loading map...
Showing 25 locations