OCGT and Reciprocating Engines

5 unique locations (42 components)

Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Musty Haugh Barn Farm Briercliffe Burnley BB10 2TN (5 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Musty Haugh Barn Farm Briercliffe Burnley BB10 2TN (1 component)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW