Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Nuclear

12 unique locations (182 components)

Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (15 components)
• Heysham 2 Power Station CMU 7: [HY2720] T_HEYM27 + (50% x T_HEYM2-D)
• In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (16 components)
• CHP engine in horticultural environment with no auxilliary load
• existing on site CHP
• existing onsite CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.46 MW
Land At Woolaston Road, Woolaston Road, Redditch, Worcestershire B98 7SG Redditch (7 components)
• Battery Storage Plant
• Heysham 1 Power Station CMU 2: [HY1223] T_HEYM12
• New reciprocating gensets in acoustic enclosure
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.52 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (5 components)
• 1.9 MW Gas gen ENER-G 1999
• A Battery Energy Storage System.
• Hunterston B Power Station CMU 7: [HU7-19] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
61.58 MW
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
• Dungeness B Power Station CMU 21: [DN2123] T_DNGB21 + (50% x T_DNGB-D)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Active • 2027-28 (T-4), 2023-24 (T-4) ...
2.58 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
ACS&T - Grimsby - Site 1, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (16 components)
• Hunterston B Power Station CMU 8: [HU8-19] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.52 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (4 components)
• Heysham 1 Power Station CMU 2: [HY1219] T_HEYM12
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2020-21 (T-1)
Loading map...
Showing 12 locations