Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Nuclear

8 unique locations (79 components)

Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (15 components)
• Heysham 2 Power Station CMU 7: [HY2720] T_HEYM27 + (50% x T_HEYM2-D)
• In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land At Woolaston Road, Woolaston Road, Redditch, Worcestershire B98 7SG Redditch (7 components)
• Battery Storage Plant
• Heysham 1 Power Station CMU 2: [HY1223] T_HEYM12
• New reciprocating gensets in acoustic enclosure
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.52 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (5 components)
• 1.9 MW Gas gen ENER-G 1999
• A Battery Energy Storage System.
• Hunterston B Power Station CMU 7: [HU7-19] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
61.58 MW
Asda Sheffield Drakehouse, Stretfield, Derbyshire, S33 9JT (5 components)
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• Hartlepool Power Station CMU 1: [HR1-21] T_HRTL-1
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
Loading map...
Showing 8 locations