7 unique locations (77 components)

ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• ROCable hydro units within the BMU are not included in the CMU.
• Turbomach M50 Natural Gas fired CHP unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
FROZEN FOODS FACTORY SUPPLY, WHAPLOAD ROAD PRIMARY SUBSTATION, REAR OF 203, WHAPLOAD ROAD, LOWESTOFT, SUFFOLK, NR32 1XQ (5 components)
• 0.3MW of demand reduction
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.27 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
Next plc Brookfield Park Manvers Way Wath-Upon-Dearne Rotherham S63 5DJ (2 components)
• 3 MW of demand reduction
• ROCable hydro units within the BMU are not included in the CMU.
Inactive • 2023-24 (T-4), 2019-20 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (3 components)
• 1 x hydro turbine & synchronous generator
• 2 MW demand reduction
Active • 2027-28 (T-4), 2019-20 (T-1)
13.38 MW
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (23 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy storage linked to solar farm
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2025-26 (T-4) ...
141.03 MW