Hydro

8 unique locations (337 components)

XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (18 components)
• 1 x hydro turbine & synchronous generator
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.97 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
46.94 MW
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3355.13 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Loading map...
Showing 8 locations