Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

74 unique locations (435 components) - Page 1 of 3

Active MW: 3547.00 MW
Inactive MW: 26.81 MW
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)

An energy from waste facility located in North Wales and designed to generate electricity (3)

Energy from Waste ENFINIUM PARC ADFER LIMITED Parc Adfer Parc Adfer +5 more CH5
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.26 MW
Wolverhampton EfW, Crown Street, West Midlands, WV1 1QB (3 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW (2)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Coal/biomass Energy from Waste Wolverhampton Waste Services Limited Wolverhampton Incinerator Wolverhampton Incinerator WV1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components) Geocoding Needed

Energy Recovery Facility burning waste (3)

Energy from Waste WESTFIELD ENERGY RECOVERY LIMITED Westfield EfW Westfield EfW +1 more
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wentloog Bio Power, Newlands Road, Wentloog Industrial Park, Cardiff, CF3 2EF (1 component)

Energy from Waste facility

Energy from Waste Mor Hafren Bio Power Limited New Build Generating CMU Môr Hafren Bio Power Limited Not Prequalified CF3
Active • 2024-25 (T-4)
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (13 components)

On-site CHP - existing generating unit (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
40.02 MW
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (12 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator. (3)

Energy from Waste VEOLIA UK LIMITED Existing Generating CMU NGEN31 Tyseley ERF +5 more B11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
121.59 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (11 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED Existing Generating CMU Cardiff ERF Cardiff ERF +4 more CF24
Active • 2029-30 (T-4), 2028-29 (T-4) ...
128.50 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.47 MW
Thames Enterprise Park, Corringham, Stanford-Le-Hope, SS17 9LL (1 component)

Energy from Waste facility

Energy from Waste THAMES BIO POWER LTD New Build Generating CMU Thames Bio Power Ltd Not Prequalified SS17
Active • 2024-25 (T-4)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)

Existing Energy from Waste Plant

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY UK LTD Existing Generating CMU STV Lines 1 and 2 EfW TS23
Active • 2029-30 (T-4), 2028-29 (T-4) ...
38.03 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (14 components)

Existing Energy from Waste Plant

Energy from Waste SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU Suffolk EfW IP6
Active • 2029-30 (T-4), 2028-29 (T-4) ...
86.69 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (14 components)
Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW TS23
Active • 2029-30 (T-4), 2028-29 (T-4) ...
82.90 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (14 components)
Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW TS23
Active • 2029-30 (T-4), 2028-29 (T-4) ...
37.40 MW
Stoke EfW plant, Campbell Road, Sideway, Stoke on Trent, ST4 4DX (6 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
South Lanarkshire Bio Power, Dovesdale Farm, Carlisle Road, Stonehouse, ML9 3PR (1 component)

Energy from Waste facility

Energy from Waste SOUTH LANARKSHIRE BIO POWER LIMITED New Build Generating CMU South Lanarkshire Bio Power Limited Not Prequalified ML9
Active • 2024-25 (T-4)
Showground Road, Bridgwater, Somerset, England, TA6 6AJ (3 components)

Energy from waste site

Energy from Waste ENGIE POWER LIMITED Existing Generating CMU TA6
Active • 2025-26 (T-4), 2025-26 (T-1) ...
6.82 MW
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Energy from Waste KIWI POWER LTD Existing Generating CMU TA6
Active • 2024-25 (T-1)
6.86 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (16 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Coal/biomass Energy from Waste INOVYN CHLORVINYLS LIMITED Existing Generating CMU RuncornERF - Phase 2 RuncornERF - Phase 2 +2 more WA7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
241.41 MW
RRRL-EfW Facility, Norman Road North, Belvedere, Kent, DA17 6JY (14 components)

Energy from Waste Recovery Facility

Active • 2029-30 (T-4), 2028-29 (T-4) ...
275.93 MW
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 component)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Energy from Waste TATA STEEL UK LIMITED Existing Generating CMU PT_G2 SA13
Inactive • 2023-24 (T-1)
26.81 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (10 components)
• Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
• Municipal waste incineration plant located in Portsmouth, Hampshire. It is based on boilers supplying steam to a turbine-generator.
Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Portsmouth ERF +6 more PO3
Active • 2029-30 (T-4), 2028-29 (T-4) ...
51.69 MW
Port Clarence Energy Limited, off Huntsman Drive, Stockton on Tees, TS2 1UE (2 components)
• Steam Turbine Generator
• The CMU is a Waste-to-Energy facility located in Port Clarence. The facility is designed to process waste feedstock and recover energy via a Steam Turbine Generator.
Active • 2027-28 (T-4), 2026-27 (T-4)
53.58 MW
Plot 8, Protos, Grinsome Road, Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Energy from Waste PROTOS ERF LIMITED PROTOS ERF PROTOS ERF CH2
Active • 2024-25 (T-4), 2023-24 (T-4)
Plot 8, Protos, Grinsome Road, Elton CH2 4LF (1 component)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations