Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

60 unique locations (318 components) - Page 2 of 3

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex CO5 9DF (1 component)

New Build Energy form Waste facility.

Energy from Waste INDAVER RIVENHALL LIMITED New Build Generating CMU Rivenhall CO5
Active • 2028-29 (T-4)
48.42 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex, CO5 9DF (1 component)

New Build Energy from waste facility

Energy from Waste INDAVER RIVENHALL LIMITED New Build Generating CMU RivenhallA Not Prequalified CO5
Active • 2028-29 (T-4)
43.93 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (11 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Existing Generating CMU Kirklees EfW Kirklees EfW +2 more HD1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.74 MW
Lakeside EFW, Lakeside Road, Colnbrook, SL3 0FE (8 components)
• Energy From Waste plant located in Colnbrook. (2)
• Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network.
Energy from Waste LAKESIDE ENERGY FROM WASTE LIMITED Existing Generating CMU Lakeside EFW Lakeside EFW +5 more SL3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
129.19 MW
Land at 338 Bogmoor Road, Govan, Glasgow G51 4FE (2 components)

Steam turbine powered by heat recovery steam generator using municipal and commercial waste as a fuel source. (2)

Energy from Waste FORTUM GLASGOW LIMITED New Build Generating CMU SOUTH CLYDE ENERGY CENTRE SOUTH CLYDE ENERGY CENTRE G51
Active • 2026-27 (T-4), 2025-26 (T-4)
37.99 MW
Land off Fryers Road Bloxwich Walsall WS3 2XQ (1 component)

An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will …

Energy from Waste ENCYCLIS (WALSALL) LIMITED New Build Generating CMU Walsall EfW WS3
Active • 2027-28 (T-4)
44.17 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (13 components)
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net. (2)
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Coal/biomass Energy from Waste FCC ENVIRONMENT (LINCOLNSHIRE) LIMITED Existing Generating CMU Lincs EFW Lincs EFW +5 more LN6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.18 MW
Lostock Works Griffiths Road Lostock Gralam Northwich CW9 7FA (1 component)

Twin boiler, single steam turbine energy from waste plant exporting at 132kV

Energy from Waste LOSTOCK SUSTAINABLE ENERGY PLANT LTD New Build Generating CMU Lostock Sustainable Energy CW9
Active • 2024-25 (T-4)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Marchwood ERF +6 more SO40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.74 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (2 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Energy from Waste MERCIA WASTE MANAGEMENT LIMITED Existing Generating CMU Mercia Waste Management Ltd Mercia Waste Management Ltd DY10
Active • 2024-25 (T-1), 2017-18 (T-1)
17.37 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (10 components)

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (3)

Coal/biomass Energy from Waste MERCIA WASTE MANAGEMENT LIMITED Existing Generating CMU Mercia Waste Management Ltd Mercia Waste Management Ltd +2 more Rejected DY10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.90 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (9 components)

New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included … (3)

Coal/biomass Energy from Waste FCC (E&M) LIMITED Existing Generating CMU Millerhill EfW Millerhill EfW +3 more EH22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.59 MW
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (8 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex (3)

Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Newhaven ERF Newhaven ERF +5 more BN9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.58 MW
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will … (2)

Energy from Waste PROTOS ERF LIMITED New Build Generating CMU PROTOS ERF PROTOS ERF CH2
Active • 2024-25 (T-4), 2023-24 (T-4)
Port Clarence Energy Limited, off Huntsman Drive, Stockton on Tees, TS2 1UE (2 components)
• Steam Turbine Generator
• The CMU is a Waste-to-Energy facility located in Port Clarence. The facility is designed to process waste feedstock and recover energy via a Steam Turbine Generator.
Active • 2027-28 (T-4), 2026-27 (T-4)
53.58 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Portsmouth ERF +6 more PO3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.34 MW
Riverside Energy Park Normal Road North, Belvedere London DA17 6JY (2 components)

New build Energy from Waste recovery facility (2)

Energy from Waste RIVERSIDE ENERGY PARK LIMITED New Build Generating CMU REPP01 REPP01 DA17
Active • 2027-28 (T-4), 2026-27 (T-4)
120.37 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (10 components)

Energy from Waste Recovery Facility (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
206.61 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (14 components)

Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations. (3)

Coal/biomass Energy from Waste INOVYN CHLORVINYLS LIMITED Existing Generating CMU RuncornERF - Phase 2 RuncornERF - Phase 2 +2 more WA7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
163.30 MW
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Energy from Waste KIWI POWER LTD Existing Generating CMU TA6
Active • 2024-25 (T-1)
6.86 MW
Showground Road, Bridgwater, Somerset, England, TA6 6AJ (3 components)

Energy from waste site

Energy from Waste ENGIE POWER LIMITED Existing Generating CMU TA6
Active • 2025-26 (T-1), 2025-26 (T-4) ...
6.82 MW
Simec Uskmouth Power Limited West Nash Road Nash Newport NP18 2BZ (1 component)

Energy pellet generating unit to be installed on the designated land at Uskmouth Power station, West Nash Road Nash. Newport. NP18 2BZ

Energy from Waste SIMEC USKMOUTH POWER LIMITED New Build Generating CMU Uskmouth Unit 14 NP18
Active • 2024-25 (T-4)
South Lanarkshire Bio Power, Dovesdale Farm, Carlisle Road, Stonehouse, ML9 3PR (1 component)

Energy from Waste facility

Energy from Waste SOUTH LANARKSHIRE BIO POWER LIMITED New Build Generating CMU South Lanarkshire Bio Power Limited Not Prequalified ML9
Active • 2024-25 (T-4)
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.59 MW
Loading map...
Showing 25 locations