Energy from Waste

2 unique locations (26 components)

Active MW: 3547.00 MW
Inactive MW: 26.81 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (12 components)
β€’ NB MPAN 1900070394446 -1900070467983. Allington Integrated Waste Management Facility Laverstoke Road 20-20 Business Park Maidstone Kent ME16 0LE. The auxiliary load is not included in the connection capacity i.e. The export is net.
β€’ This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
β€’ This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. The auxiliary are only used to achieve a safe shutdown in the case of a black site, when not connected to the grid. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Coal/biomass Energy from Waste KENT ENVIROPOWER LIMITED Existing Generating CMU Allington EFW Allington EFW +2 more ME16
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
129.64 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (14 components)
β€’ FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
β€’ New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
β€’ New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13.1MW. The auxiliary load is not included in the connection capacity, as it is not used for export generation. The auxiliary are only used to achieve a safe shutdown in the case of a black site, when not connected to the grid. i.e.the export is net.
Coal/biomass Energy from Waste FCC ENVIRONMENT (LINCOLNSHIRE) LIMITED Existing Generating CMU Lincs EFW Lincs EFW +5 more LN6
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
57.81 MW
Loading map...
Showing 2 locations