Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

2 unique locations (9 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (1 component)

An energy from waste facility located in North Wales and designed to generate electricity

Energy from Waste ENFINIUM PARC ADFER LIMITED New Build Generating CMU Parc Adfer CH5
Inactive • 2020-21 (T-1)
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (8 components)

An energy from waste facility located in North Wales and designed to generate electricity (3)

Energy from Waste ENFINIUM PARC ADFER LIMITED Existing Generating CMU Parc Adfer Parc Adfer +5 more CH5
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.26 MW
Loading map...
Showing 2 locations