Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

16 unique locations (53 components)

Active MW: 3547.00 MW
Inactive MW: 26.81 MW
251 Glasgow And Edinburgh Road, Coatbridge, ML5 4UG (1 component)

Energy from Waste facility

Energy from Waste North Lanarkshire Bio Power Limited New Build Generating CMU North Lanarkshire Bio Power Limited ML5
Active • 2024-25
342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV

Energy from Waste SSE SLOUGH MULTIFUEL LIMITED New Build Generating CMU Slough Multifuel Slough Multifuel SL1
Active • 2024-25, 2023-24
Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA (2 components)

VIT301 - 18MW Steam Turbine at Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA

Active • 2025-26 (T-4), 2024-25 (T-4)
EcoPark, Advent Way, Edmonton, London N18 3AG (11 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Coal/biomass Energy from Waste LONDONENERGY LTD Existing Generating CMU LondonWaste LondonWaste +4 more N18
Active • 2026-27 (T-1), 2025-26 (T-1) ...
35.36 MW
Ferrybridge MFE Limited, Kirkhaw Lane, Off Stranglands Lane, Knottingley, West Yorkshire, WF11 8DX (5 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Hay Hall Road, Tyseley, Birmingham, B11 2AU (4 components)
• Energy from Waste facility
• Energy from Waste facility.
Energy from Waste HAY HALL BIO POWER LIMITED New Build Generating CMU Hay Hall Bio Power Limited Hay Hall Bio Power Limited +1 more Not Prequalified B11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.97 MW
Lostock Works, Griffiths Road, Lostock Gralam, Northwich, CW9 7FA (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 132kV

Active • 2029-30 (T-4), 2024-25 (T-4)
62.05 MW
Plot 8, Protos, Grinsome Road, Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Energy from Waste PROTOS ERF LIMITED PROTOS ERF PROTOS ERF CH2
Active • 2024-25 (T-4), 2023-24 (T-4)
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Energy from Waste KIWI POWER LTD Existing Generating CMU TA6
Active • 2024-25 (T-1)
6.86 MW
Showground Road, Bridgwater, Somerset, England, TA6 6AJ (3 components)

Energy from waste site

Energy from Waste ENGIE POWER LIMITED Existing Generating CMU TA6
Active • 2025-26 (T-4), 2025-26 (T-1) ...
6.82 MW
South Lanarkshire Bio Power, Dovesdale Farm, Carlisle Road, Stonehouse, ML9 3PR (1 component)

Energy from Waste facility

Energy from Waste SOUTH LANARKSHIRE BIO POWER LIMITED New Build Generating CMU South Lanarkshire Bio Power Limited Not Prequalified ML9
Active • 2024-25 (T-4)
Thames Enterprise Park, Corringham, Stanford-Le-Hope, SS17 9LL (1 component)

Energy from Waste facility

Energy from Waste THAMES BIO POWER LTD New Build Generating CMU Thames Bio Power Ltd Not Prequalified SS17
Active • 2024-25 (T-4)
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.47 MW
Wentloog Bio Power, Newlands Road, Wentloog Industrial Park, Cardiff, CF3 2EF (1 component)

Energy from Waste facility

Energy from Waste Mor Hafren Bio Power Limited New Build Generating CMU Môr Hafren Bio Power Limited Not Prequalified CF3
Active • 2024-25 (T-4)
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components) Geocoding Needed

Energy Recovery Facility burning waste (3)

Energy from Waste WESTFIELD ENERGY RECOVERY LIMITED Westfield EfW Westfield EfW +1 more
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 16 locations