Energy from Waste

13 unique locations (48 components)

Active MW: 3547.00 MW
Inactive MW: 26.81 MW
342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV

Energy from Waste SSE SLOUGH MULTIFUEL LIMITED New Build Generating CMU Slough Multifuel Slough Multifuel SL1
Active • 2024-25, 2023-24
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED New Build Generating CMU Avonmouth ERF Avonmouth ERF +2 more BS11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bolton Thermal Recovery Facility, Raikes Lane Industrial Estate, Bolton, Greater Manchester, BL3 2NP (3 components)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Active • 2029-30 (T-4), 2023-24 (T-4) ...
8.54 MW
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility

Coal/biomass Energy from Waste North Lanarkshire Bio Power Limited New Build Generating CMU North Lanarkshire Bio Power Limited North Lanarkshire Bio Power Limited +1 more Conditional ML5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ferrybridge MFE Limited, Kirkhaw Lane, Off Stranglands Lane, Knottingley, West Yorkshire, WF11 8DX (5 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Newhurst Quarry, Ashby Road East, Shepshed, Leicestershire, LE12 9BU (2 components)

An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Energy from Waste NEWHURST ERF LIMITED New Build Generating CMU Newhurst EfW Newhurst EfW LE12
Inactive • 2023-24 (T-4), 2022-23 (T-4)
Newlands Road, Wentloog, Cardiff, CF3 2EF (4 components)
• Energy From Waste facility
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Coal/biomass Energy from Waste HOOTON BIO POWER LIMITED New Build Generating CMU Hooton Bio Power Limited Hooton Bio Power Limited +1 more Conditional CH65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot 8, Protos, Grinsome Road, Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Energy from Waste PROTOS ERF LIMITED PROTOS ERF PROTOS ERF CH2
Active • 2024-25 (T-4), 2023-24 (T-4)
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 component)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Energy from Waste TATA STEEL UK LIMITED Existing Generating CMU PT_G2 SA13
Inactive • 2023-24 (T-1)
26.81 MW
Stoke EfW plant, Campbell Road, Sideway, Stoke on Trent, ST4 4DX (6 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components) Geocoding Needed

Energy Recovery Facility burning waste (3)

Energy from Waste WESTFIELD ENERGY RECOVERY LIMITED Westfield EfW Westfield EfW +1 more
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 13 locations