Energy from Waste

6 unique locations (22 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (4 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement) (2)
• 2 stream municipal waste incinerator
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator +1 more ST4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Coal/biomass Energy from Waste HOOTON BIO POWER LIMITED New Build Generating CMU Hooton Bio Power Limited Hooton Bio Power Limited +1 more Not Prequalified CH65
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (2 components) Geocoding Needed

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …

Inactive • 2022-23 (T-3), 2022-23 (T-4)
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (5 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (3)

Coal/biomass Energy from Waste ENFINIUM FERRYBRIDGE 1 LIMITED Existing Generating CMU FM1 FM1 +2 more WF11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bolton Thermal Recovery Facility Raikes Lane Industrial Estate Bolton Greater Manchester BL3 2NP (2 components)

New Build Energy from Waste Plant (2)

Energy from Waste SUEZ RECYCLING AND RECOVERY UK LTD New Build Generating CMU Bolton TRF BL3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth. (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED New Build Generating CMU Avonmouth ERF Avonmouth ERF +2 more BS11
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...