Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

83 unique locations (374 components) - Page 4 of 4

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (1 component)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Energy from Waste Valencia Waste Management Limited New Build Generating CMU Beddington ERF CR0
Inactive • 2019-20 (T-1)
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (4 components)

Energy from Waste plant fuelled by biomass (3)

Energy from Waste E.ON UK PLC Existing Generating CMU BAD_BIO BAD_BIO CV9
Active • 2028-29 (T-4), 2025-26 (T-4) ...
17.04 MW
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth. (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED New Build Generating CMU Avonmouth ERF Avonmouth ERF +2 more BS11
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (7 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.05 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (11 components)

This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington … (3)

Coal/biomass Energy from Waste KENT ENVIROPOWER LIMITED Existing Generating CMU Allington EFW Allington EFW +2 more ME16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
98.65 MW
Allerton Waste Recovery Park, Knaresborough HG5 0SD (1 component)

Energy from waste site

Energy from Waste ENGIE POWER LIMITED Existing Generating CMU HG5
Active • 2025-26 (T-4)
342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV (2)

Energy from Waste SSE SLOUGH MULTIFUEL LIMITED New Build Generating CMU Slough Multifuel Slough Multifuel SL1
Active • 2024-25 (T-4), 2023-24 (T-4)
251 Glasgow And Edinburgh Road, Coatbridge, ML5 4UG (1 component)

Energy from Waste facility

Energy from Waste North Lanarkshire Bio Power Limited New Build Generating CMU North Lanarkshire Bio Power Limited Not Prequalified ML5
Active • 2024-25 (T-4)
Loading map...
Showing 8 locations