Energy from Waste

1 unique locations (2 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Wolverhampton EfW Crown Street West Midlands WV1 1QB (2 components)
β€’ 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
β€’ 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Coal/biomass Energy from Waste Wolverhampton Waste Services Limited Existing Generating CMU Wolverhampton Incinerator Wolverhampton Incinerator Rejected WV1
Inactive β€’ 2019-20 (T-1), 2018-19 (T-1)