Energy from Waste

4 unique locations (72 components)

Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB (13 components)
• Existing CMU comprising of battery storage and associated plant
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
104.96 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• load curtailment at site
Active • 2028-29 (T-4), 2026-27 (T-4) ...
11.07 MW
Loading map...