Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

15 unique locations (92 components)

342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a … (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bolton Thermal Recovery Facility Raikes Lane Industrial Estate Bolton Greater Manchester BL3 2NP (2 components)

New Build Energy from Waste Plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (10 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (3)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (4 components)
• Energy from Waste facility. (2)
• Energy from Waste facility
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.97 MW
Newhurst Quarry, Ashby Road East, Shepshed, Leicestershire, LE12 9BU (2 components)

An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Inactive • 2023-24 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will … (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
206.61 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being … (2)
• 2 stream municipal waste incinerator
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.89 MW
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components)

Energy Recovery Facility burning waste (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 15 locations