Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

4019 unique locations (65099 components) - Page 18 of 161

BROWN AVENUE STIRLING STIRLINGSHIRE FK9 (4 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
BROWNBERRIE AVENUE HORSFORTH LEEDS LS18 (7 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
BROW NINEVAH LANE BADSWORTH PONTEFRACT WF9 (4 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
BROWNING CRESCENT BLETCHLEY MILTON KEYNES MK3 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
BRUCE COTTAGES DYKESIDE FREUCHIE CUPAR FIFE KY15 (4 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Brynach Llanfrynach Brecon Powys LD3 (14 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
158.22 MW
Bryndale Grove Sale Cheshire M33 (4 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
BS1 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
0.01 MW
BS10 (38 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
82.85 MW
BS11 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.66 MW
BS13 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
69.34 MW
BS14 (20 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
81.13 MW
BS15 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.48 MW
BS16 (62 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
158.02 MW
BS21 (29 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
122.95 MW
BS22 (50 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
113.44 MW
BS23 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.12 MW
BS24 (41 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
96.62 MW
BS25 (14 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
29.72 MW
BS29 (6 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
14.09 MW
BS3 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
65.27 MW
BS30 (34 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
73.84 MW
BS31 (44 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
129.90 MW
BS32 (53 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
130.24 MW
BS34 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
119.36 MW
Loading map...
Showing 25 locations