Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

1743 unique locations (42080 components) - Page 1 of 70

AB12 (88 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-4) ...
54.45 MW
AB14 (9 components)
• Domestic EV charger (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
AB15 (67 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB15
Active • 2027-28 (T-4), 2025-26 (T-4) ...
270.71 MW
AB16 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
0.03 MW
AB30 (11 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.04 MW
AB31 (52 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AB31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
136.45 MW
AB32 (23 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR EV Charging Rejected AB32
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
AB39 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
AB41 (46 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB41
Active • 2027-28 (T-4), 2025-26 (T-4) ...
165.45 MW
AB43 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
AB45 (14 components)

Domestic EV charger (2)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
AL1 (123 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
273.15 MW
AL10 (19 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
AL2 (73 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
95.86 MW
AL3 (72 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL3
Active • 2027-28 (T-4), 2025-26 (T-4) ...
160.91 MW
AL4 (72 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
168.19 MW
AL5 (101 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
DSR EV Charging Rejected AL5
Active • 2025-26 (T-4), 2025-26 (T-1) ...
342.94 MW
AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL6
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.09 MW
AL7 (37 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
117.60 MW
AL8 (10 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
AL9 (27 components)
• Domestic EV charger (2)
• Domestic demand turn down
DSR EV Charging Rejected AL9
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.00 MW
B11 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
B13 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.17 MW
B14 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
B15 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.05 MW
Loading map...
Showing 25 locations