Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

390 unique locations (12576 components) - Page 1 of 16

AB15 (67 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB15
Active • 2027-28 (T-4), 2025-26 (T-4) ...
270.71 MW
AB31 (52 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AB31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
136.45 MW
AB39 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
AB41 (46 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB41
Active • 2027-28 (T-4), 2025-26 (T-4) ...
165.45 MW
AB42 (111 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
84.91 MW
AB43 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
204.06 MW
AL2 (73 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
95.86 MW
AL3 (72 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL3
Active • 2027-28 (T-4), 2025-26 (T-4) ...
160.91 MW
AL5 (101 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
DSR EV Charging Rejected AL5
Active • 2025-26 (T-4), 2025-26 (T-1) ...
342.94 MW
AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL6
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.09 MW
AL7 (37 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
117.60 MW
B30 (14 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.15 MW
B36 (11 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.01 MW
B46 (11 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.05 MW
B69 (14 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.07 MW
B72 (16 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.20 MW
B73 (22 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.09 MW
B76 (21 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.14 MW
B77 (48 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
184.01 MW
B90 (51 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
247.86 MW
B93 (46 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
164.69 MW
BA2 (46 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
112.23 MW
BA9 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.01 MW
BB1 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.07 MW
Loading map...
Showing 25 locations