Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

13465 unique locations (95520 components) - Page 1 of 539

ZUBRON GROVE MILTON KEYNES BUCKINGHAMSHIRE MK8 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.00 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
ZE2 (13 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
42.25 MW
ZE1 (2 components)

Domestic EV charger

DSR
Active • 2024-25 (T-4), 2024-25 (T-1)
7.04 MW
Y Wern Graiglwyd Road, Penmaenmawr, Gwynedd, LL34 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
YOUNGHALL CLOSE GREENSIDE RYTON NE40 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
YOULDEN CLOSE CAMBERLEY SURREY GU15 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
Youens Crescent Newton Aycliffe County Durham DL5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)
• On site reduction in consumption
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2024-25 (T-4), 2024-25 (T-1)
YORKSHIRE WATER PLC, SEWAGE TREATMENT WORKS, ALDWARKE, ROTHERHAM, SOUTH YORKSHIRE, S65 3SR (2 components)
• On site reduction in consumption
• Reciprocating genset
Active • 2024-25 (T-1)
0.92 MW
YORKSHIRE WATER PLC, CHELLOW HEIGHTS W T W, HAWORTH ROAD, BRADFORD, BD9 6NX (2 components)

On site reduction in consumption

Active • 2024-25 (T-1)
14.00 MW
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Yorkshire Water, Huddersfield HD2 1GQ (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2024-25 (T-1)
14.00 MW
0.92 MW
York Road, Stevenage, Hertfordshire, SG1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
YORK ROAD NORTH DUFFIELD SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
York Road Great Britain UB8 1QW (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.01 MW
York Road Cliffe Selby YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
YORK AVENUE JARROW NE32 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
YO8 (45 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
171.01 MW
Loading map...
Showing 25 locations