Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

937 unique locations (4655 components) - Page 1 of 38

XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)

On site reduction in consumption (2)

Active β€’ 2025-26 (T-1), 2024-25 (T-1)
0.23 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (15 components)
β€’ 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
β€’ 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
β€’ 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Stagecoach Group Plc, Unit 7 Riverway Esta Portsmouth Road, Peasmarsh Guildford, GU3 1LZ (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
OI Manufacturing Alloa Kelliebank House, Glasshouse Loan, Alloa FK10 1NT, United Kingdom (22 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (15 components)

Load reduction on site supported by non-exporting standby generation. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Peterlee, 5-6 Burdon Drive, North West Industrial Estate, Peterlee, County Durham, SR8 2JH (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
AYLESFORD MOUNT LEEDS LS15 (6 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
AYCLIFFE SEWAGE TREATMENT WKS, DURHAM WAY NORTH, NEWTON AYCLIFFE, DL5 6HP (2 components)

On site reduction in consumption (2)

Active β€’ 2025-26 (T-1), 2024-25 (T-1)
0.23 MW
AXMINSTER, EX13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active β€’ 2025-26 (T-1)
0.00 MW
AVENUE THE AVENUE ASPLEY GUISE MILTON KEYNES MK17 (8 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.09 MW
ATOS, Andover Data Centre, Shepherds Spring Lane, Andover, SP10 1DL (4 components)

2.0MW - 2.3MWh Battery Energy Storage System (2)

Active β€’ 2025-26 (T-4), 2022-23 (T-1)
6.28 MW
ASWARBY WW, LONDON ROAD A15 ASWARBY, NG34 9SE (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
3.26 MW
ASPEN CLOSE BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
3.69 MW
ASKET DRIVE SEACROFT LEEDS LS14 (5 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.08 MW
ASKET CLOSE SEACROFT LEEDS LS14 (6 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
ASHURSTWOOD KENTS HILL MILTON KEYNES BUCKINGHAMSHIRE MK7 (9 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.10 MW
ASHEN DRIVE MILTON OF CAMPSIE GLASGOW G66 (7 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.08 MW
ASH CHAPEL VIEW SHADWELL LEEDS LS17 (6 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
ASHBOURNE DRIVE WESTON CREWE CHESHIRE CW2 (12 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
ASHBOURNE AVENUE LEEDS LS15 (6 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
Asda Wellington, Longforth Road TA21 8RQ (8 components)
β€’ Load drop (4)
β€’ Load curtailment from refridgeration
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Washington ADC, Pattinson Ind Est District 15, NE38 8QA (12 components)
β€’ Load curtailment from refridgeration
β€’ Load reduction from refrigeration
β€’ Load reduction on site supported by non-exporting standby generation.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
3.76 MW
Asda Wallsend, Hadrian Road Wallsend, Tyne and Wear, NE286HH (11 components)
β€’ Load curtailment (4)
β€’ Load curtailment from refridgeration
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations