Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR

12072 unique locations (62513 components) - Page 482 of 483

Active MW: 461363.03 MW
Inactive MW: 46264.47 MW
YO31 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
80.44 MW
YO32 (22 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
190.18 MW
YO41 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
160.67 MW
YO42 (18 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1)
167.12 MW
YO43 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1)
59.02 MW
YO51 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
55.33 MW
YO60 (4 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1)
82.92 MW
YO61 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
327.33 MW
YO62 (6 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
95.99 MW
YO7 (16 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1)
100.55 MW
YO8 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
332.25 MW
YORK AVENUE JARROW NE32 (1 component)

EV charging at residential premises

DSR OCTOPUS ENERGY LIMITED Proven DSR CMU
Inactive • 2023-24 (T-1)
4.00 MW
York Road Cliffe Selby YO8 (2 components)

EV charging at residential premises

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU Rejected
Active • 2024-25 (T-1), 2023-24 (T-1)
15.05 MW
YORK ROAD NORTH DUFFIELD SELBY YO8 (2 components)

EV charging at residential premises

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU Rejected
Active • 2024-25 (T-1), 2023-24 (T-1)
15.05 MW
YORKSHIRE WATER ASSOCIATION, HIGHFIELD LANE BOREHOLE, HIGH STREET, AUSTERFIELD, DONCASTER, SOUTH YORKSHIRE, DN10 6RG (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 DN10
Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER AUTHORITY, WATER TREATMENT WORKS, SANDHILL LANE, SUTTON ON DERWENT, YORK, YO41 4BX (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 YO41
Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER AUTHORITY, WATER TREATMENT WORKS, SANDHILL LANE, SUTTON ON DERWENT, YORK, YO41 4BX (4 components)

On site reduction in consumption

DSR KIWI POWER LTD Proven DSR CMU EDRU01 YO41
Active • 2025-26 (T-1), 2024-25 (T-1)
30.00 MW
Yorkshire Water, Huddersfield HD2 1GQ (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

DSR GRIDBEYOND LIMITED Unproven DSR CMU Not Prequalified HD2
Active • 2027-28 (T-4), 2024-25 (T-1)
6.95 MW
YORKSHIRE WATER NORTH EASTERN, FRICKLEY BOOSTER STATION, FRICKLEY, DONCASTER, SOUTH YORKSHIRE, DN5 7BU (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 DN5
Active • 2025-26 (T-1), 2024-25 (T-1)
30.00 MW
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 HD2
Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
30.00 MW
YORKSHIRE WATER PLC, BLACKBURN MEADOWS, ALSING ROAD, WINCOBANK, SHEFFIELD, S9 1HF (2 components)

On site reduction in consumption

DSR KIWI POWER LTD Proven DSR CMU EDRU01 S9
Active • 2025-26 (T-1), 2024-25 (T-1)
30.00 MW
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 WF1
Active • 2025-26 (T-1), 2024-25 (T-1)
Loading map...
Showing 25 locations