Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

11081 unique locations (79220 components) - Page 44 of 444

TS14 (19 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
55.29 MW
TS13 (5 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
14.46 MW
TS12 (11 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
36.06 MW
TS11 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
TS10 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
149.75 MW
TRUSS HILL ROAD, ASCOT, BERKSHIRE, SL5 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Truro Pydar St - West Cornwall TR1 2BD (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.80 MW
Trumpsgreen Road Virginia Water Surrey GU25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
TRUMPSGREEN AVENUE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Trull Road, Taunton, Somerset, TA1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
TRUELOVE GARDENS, BILLINGSHURST, WEST SUSSEX, RH14 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Trudoxhill, Frome, Somerset, BA11 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
Tritton Road Great Britain LN6 7QN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.01 MW
Trinity View, Newport, Newport, NP18 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
Trinity Street Great Britain BL3 6BY (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.01 MW
Trinity Close Crawley West Sussex RH10 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
Trimaran Road Southampton Hampshire SO31 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Trevithick Lane, Shenley Lodge, Milton Keynes, MK5 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
7.20 MW
Treverbyn Road Plymouth Devon PL7 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
TRETHURGY, ST. AUSTELL, CORNWALL, PL26 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
Trent Road NEWPORT Newport NP20 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Trent Close, Wellingborough, NN8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
Trem Nant Eirias Colwyn Bay Clwyd LL29 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
TREE TOPS COURT LEEDS LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
Loading map...
Showing 25 locations