Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7295 unique locations (73801 components) - Page 32 of 292

THATCHED COTTAGE WORTLEY WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHED COTTAGE WHITENAP LANE ROMSEY HAMPSHIRE SO51 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
TF9 (25 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.09 MW
TF7 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.08 MW
TF6 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.05 MW
TF5 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
TF4 (23 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.09 MW
TF3 (20 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.15 MW
TF2 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.06 MW
TF13 (8 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.03 MW
TF12 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
TF11 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
TF10 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
95.34 MW
TF1 (39 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
178.23 MW
Tewkesbury Road, Cheltenham GL51 9DT , United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
TETBURY DRIVE WITNEY OXFORDSHIRE OX28 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Terringes Avenue, Worthing, BN13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tennyson Road, Romford, Essex, RM3 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TENNYSON ROAD, GREAT YARMOUTH, NORFOLK, NR30 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tenderah Road, Helston, Cornwall, TR13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tenby Grove Kingsmead Milton Keynes Buckinghamshire MK4 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Tenax Road, Trafford Park, Manchester, M17 1JT, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Temple Sowerby, Penrith, Cumbria, CA10 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Templegate Avenue, Leeds, West Yorkshire, LS15 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (3 components)

Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations