Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84001 components) - Page 199 of 397

HEWER DRIVE CASTLE GRESLEY SWADLINCOTE DERBYSHIRE DE11 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Heyford Hill Littlemore Great Britain OX4 4XR (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (8 components)
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
HG1 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.20 MW
HG2 (32 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.60 MW
HG2 7LB (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
HG3 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
70.71 MW
HG3 1LP (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
HG4 (24 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.12 MW
HG5 (26 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.20 MW
HIDDEN LOCK SMETHWICK WEST MIDLANDS B66 (15 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hids Copse Road, Oxford, OX2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
HIGH BANK CRESCENT DARWEN LANCASHIRE BB3 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
HIGH CARR CLOSE FRAMWELLGATE MOOR DURHAM COUNTY DURHAM DH1 (11 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
HIGHCLERE DRIVE SUNDERLAND SR2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
HIGHCLIFFE COURT SHELF HALIFAX HX3 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
High Court Way, Hampton Vale, Peterborough, Cambridgeshire, PE7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
HIGHCROFT HYDE CHESHIRE SK14 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
HIGHER DRAKE MEADOW WESTHOUGHTON BOLTON LANCASHIRE BL5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Higher Manor Terrace, Paignton, TQ3 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
HIGHFIELD AVENUE SALE CHESHIRE M33 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
HIGHFIELD CRESCENT BARLBY SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Highfield Crescent, Woodlesford, Leeds, LS26 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
HIGHFIELD CRESCENT WOODLESFORD LEEDS LS26 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
Loading map...
Showing 25 locations