Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

12894 unique locations (87583 components) - Page 172 of 516

Edinburgh Way, Harlow CM20 2DB, UK (19 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.44 MW
Edlington Drive Wollaton NOTTINGHAM NOTTINGHAMSHIRE NG8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Edlington Lane Edlington, Doncaster, DN121DL (15 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Edmunds Road, Cranwell Village, Sleaford, NG34 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
EDWARD PHILLIPPS ROAD LOUGHBOROUGH LEICESTERSHIRE LE12 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Edwards Gardens Swanley Kent BR8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
Eg: BS6 (10 components)

Aggregated domestic electric vehicle chargers

Active • 2025-26 (T-1)
120.04 MW
Egerton High Legh Knutsford Cheshire WA16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
EGERTON PARK, BIRKENHEAD, MERSEYSIDE, CH42 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
Eggington IPS, Derby Road, Stretton, Derbyshire, DE13 0DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
10.32 MW
Eggington IPS, Derby Road, Stretton, Derbyshire, DE65 6HA (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eggington IPS, Derby Road, Stretton, Derbyshire, DE65 6HA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
EGREMONT PLACE SHERBURN IN ELMET LEEDS NORTH YORKSHIRE LS25 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
EH10 (35 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
94.16 MW
EH11 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
29.36 MW
EH12 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
184.22 MW
EH13 (15 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
61.30 MW
EH14 (39 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
204.97 MW
EH15 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.61 MW
EH16 (10 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
28.17 MW
EH17 (19 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
124.99 MW
EH18 (2 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4)
4.50 MW
EH19 (27 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
74.90 MW
EH20 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.73 MW
EH21 (8 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
58.50 MW
Loading map...
Showing 25 locations