Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

14 unique locations (349 components)

British Gas, New Bridge Ln, Stockport, SK1 2GT (14 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.43 MW
CM23 (80 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
243.85 MW
CR5 (41 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
315.24 MW
HSH - Grimsby - Site 2 Birchin Way, Grimsby DN31 2SG, United Kingdom (26 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.03 MW
Hungerford Farm, Winchfield, Hook RG27 8SW (5 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Lunar Freezing - Damhead Way, Peterhead, Aberdeenshire, SCOTLAND, AB42 3GY (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.17 MW
ME2 (24 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
329.60 MW
Mill Rd, Burston IP22 5TJ (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
2.86 MW
PL7 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
319.50 MW
RG31 (42 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
336.44 MW
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (11 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
TBA (29 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Tilbury STW, TILBURY-STW, Fort Road, TILBURY Essex, RM18 8UL, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 14 locations