DSR (Demand Side Response)

3 unique locations (323 components)

Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.28 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW