Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7 unique locations (55 components)

Wimbourne Bournemouth BH21 5EP (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Water treatment centre
Inactive • 2023-24 (T-4), 2019-20 (T-1)
TBA (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
New Winning Pumping Station CastleEden Hartlepool Cleveland, TS27 4TF (3 components)
• 3 MW of demand reduction
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Inactive • 2021-22 (T-4), 2019-20 (T-1)
MOONSHILL QUARRY, STOKE HILL, STOKE ST. MICHAEL, RADSTOCK, BA3 5JU (10 components)
• 0.1MW of demand reduction
• 3MW of DSR
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BESTWOOD QUARRY, NOTTINGHAM ROAD A60, NOTTINGHAM, NOTTINGHAMSHIRE, NG15 8FL (7 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage).
• DSR Component providing load turn down at a manufacturing site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (16 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage).
• Peak power plant
• Reciprocating engine
Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
Loading map...
Showing 7 locations