Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

30 unique locations (763 components) - Page 1 of 2

133 Balornock Road, Glasgow, G21 3UW (18 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Generators on hospital site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.41 MW
2 Bar Lane, York, YO51 9LS (60 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New build gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)
• 4 MW of demand reduction
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2019-20 (T-1)
269.81 MW
adjacent to Kilmarnock South Substation KA1 3TN (10 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Lithium ion battery storage plant
• To be confirmed once components are known
Active • 2026-27 (T-4), 2025-26 (T-1) ...
107.51 MW
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (13 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
382.93 MW
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (48 components)
• 1hr duration battery storage project.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
476.10 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land North East Of East Sleekburn C415 Spine Road To East Sleekburn, Bedlington, Northumberland, NE22 7BG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NSL is a 1,400 MW subsea high-voltage direct current electricity cable under construction between Norway and the United Kingdom which will connect the Transmission Systems of Norway and Great Britain. The cable will run from Kvilldal in Norway, to Blyth in the United Kingdom. The converter station in England will be located near to the cable landfall in East Sleekburn village and it will be connected to the National Grid at the Blyth substation.
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1218.00 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
• BM Unit T_FFES-2 at Ffestiniog Power Station (Pumped Storage).
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.28 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 49.5MW Battery Energy Storage facility
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
376.72 MW
OI Manufacturing Alloa Kelliebank House, Glasshouse Loan, Alloa FK10 1NT, United Kingdom (25 components)
• Aberthaw 8 Coal fired
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.19 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (10 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• EV charging at residential premises
• Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
51.22 MW
Loading map...
Showing 25 locations