DSR (Demand Side Response)

47 unique locations (1065 components) - Page 1 of 2

WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (19 components)
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• Hanson 2 - DSR Turn Down/ Load Reduction
• Storage facility
Active • 2024-25 (T-1), 2023-24 (T-4) ...
16.35 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Medway Power Station, Rochester, Medway, ME3 0AG (29 components)
• A gas fuelled generating station.
• Genset 3
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6669.90 MW
Marsh Road, Banks, Southport PR9 8DX (22 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.21 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.49 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 49.5MW Battery Energy Storage facility
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
376.72 MW
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (9 components)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is made.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Lawford Rd, Rugby CV21 2RY, United Kingdom (20 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.62 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land to north east of Electricity Substation, Fordbridge Lane, Blackwell DE55 5JY Alfreton (6 components)
• A standby diesel generator on a waster water treatment works.
• New reciprocating gensets in acoustic enclosure
• The CMU Component is made up of gas-fired engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
20.97 MW
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.56 MW
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
• Battery energy storage unit
• CHP at a horticultural environment.
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Land off Orwell Street, Grimsby, DN31 3HF (3 components)
• New reciprocating gensets in acoustic enclosure
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)
• Component has yet to be procured.
• Reciprocating genset
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.19 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (10 components)
• Battery energy storage unit
• Distribution Centre with behind the meter back-up generation.
• N/A
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.46 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)
• Battery energy storage unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2021-22 (T-4)
16.74 MW
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)
• N/A
• New reciprocating gensets in acoustic enclosure
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2024-25 (T-4), 2024-25 (T-1) ...
5.47 MW
Loading map...
Showing 25 locations