DSR (Demand Side Response)

31 unique locations (622 components) - Page 1 of 2

Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Far Cotton, Kings Park Road, Moulton Park, Northampton, NN3 6NW (6 components)
• Load curtailment on site and standby generation
• Load reduction via standby generation taking onsite load
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Longwell Green, Combe Park, Bath, BA1 3NG (6 components)
• Load curtailment via standby generation
• New reciprocating gensets in acoustic enclosure
• Standby generation x 2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Swindon Haydon, Windmill Hill Business Park, Swindon, SN5 6QR (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (29 components)
• 1 x OCGT
• Commercial printers
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
577.46 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (12 components)
• Battery energy storage unit
• N/A
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.86 MW
Headways, Stanley, Wakefield WF3 4BY, United Kingdom (26 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
• Octopus Energy customers actively turning down their demand when requested to do so
Active • 2028-29 (T-4), 2026-27 (T-4) ...
43.44 MW
Hunslet Park Depot, Donisthorpe Street, Leeds, Yorkshire, LS10 1PL (9 components)
• 0.39MW Battery Storage located at Hunslet Park Depot, Leeds
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• New reciprocating gensets in acoustic enclosure
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Enterprise Court, Corby, NN18 8ES (62 components)
• Gas fired reciprocating engines.
• N/A
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
48.47 MW
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (8 components)
• 20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic building/enclosure
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Land At Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire, ST5 9JA (4 components)
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
• New reciprocating gensets in acoustic building/enclosure
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)
• N/A
• New reciprocating gensets in acoustic enclosure
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2024-25 (T-4), 2024-25 (T-1) ...
5.47 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)
• Battery energy storage unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2021-22 (T-4)
16.74 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (10 components)
• Battery energy storage unit
• Distribution Centre with behind the meter back-up generation.
• N/A
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.46 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)
• Component has yet to be procured.
• Reciprocating genset
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.19 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off Orwell Street, Grimsby, DN31 3HF (3 components)
• New reciprocating gensets in acoustic enclosure
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
• Battery energy storage unit
• CHP at a horticultural environment.
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Loading map...
Showing 25 locations