DSR (Demand Side Response)

45 unique locations (1789 components) - Page 1 of 2

Worset Lane, Hartlepool, TS27 3BQ (4 components)
• A new build, gas fuelled generation station
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.47 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)
• Load reduction on site supported by non-exporting standby generation.
• N/A
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Unproven DSR yet to be procured (46 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
University of Warwick, Coventry, CV4 7AL (55 components)
• N/A
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
20.78 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
St Johns Town of Dalry Castle, Douglas Kirkcudbright, DG7 3SR (8 components)
• Earlstoun hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.63 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (20 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
• Industrial Gases production processes. DSR delivered through process interruption
Active • 2025-26 (T-1), 2024-25 (T-1) ...
16.06 MW
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (14 components)
• Gas CHP
• Gas CHP in St. Austell
• N/A
Active • 2026-27 (T-4), 2024-25 (T-4) ...
13.37 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (4 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• N/A
Active • 2025-26 (T-1), 2023-24 (T-1) ...
15.37 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)
• 19.500 MW of battery storage located at Hereford.
• Nantwich Existing Site CHP
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2027-28 (T-4), 2023-24 (T-4) ...
17.31 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (2 components)
• Gas reciprocating engines
• N/A
Active • 2025-26 (T-4), 2023-24 (T-4)
47.73 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (59 components)
• Keadby 1 CCGT
• Keadby GT3
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5902.68 MW
Holmewood Field Industrial Park, Park Rd, Holmewood Industrial Park, Holmewood, Chesterfield, Derbyshire S42 5BX (13 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.04 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (17 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load curtailment
Active • 2027-28 (T-4), 2025-26 (T-4) ...
28.85 MW
Heath Mill Rd, Wombourne, Wolverhampton WV5 8AE, United Kingdom (20 components)
• A new build gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.54 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Loading map...
Showing 25 locations