25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
88 Coventry Road Broughton Astley Leicester LE9 6QA (7 components)
• 2.52MW Battery Storage located at PepsiCo Leicester factory
• N/A
• New build power station comprised of multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Abergelli Power Station, Felindre, Swansea, SA5 7NN (4 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (15 components)
• A New Build 2.5MW Generation Battery Site
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.31 MW
ASDA Ambient Depot, Earls Road, Earlsgate Park Grangemouth, FK3 8UU (11 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2024-25 (T-4) ...
20.36 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Asda Garston, St Marys Road Garston, Liverpool, L19 1SJ (12 components)
• Load curtailment
• Load curtailment from refridgeration
• N/A
Active • 2028-29 (T-4), 2024-25 (T-1) ...
18.11 MW
Asda Norwich, Drayton High Road, Hellesdon, NR6 5DT (12 components)
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (16 components)
• Gas fired reciprocating engines
• Gas-fired reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.02 MW
Bourton, Buckingham, MK18 7DU (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• N/A
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (6 components)
• EV charging at residential premises
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.46 MW
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)
• 5 MW of demand reduction
• N/A
Inactive • 2022-23 (T-3), 2019-20 (T-1)
Church Bottom, Salisbury, SP4 6NN (2 components)
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Crosby Power, Church Street, Bootle, L20 1AF (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• N/A
Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.20 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (71 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
565.82 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.59 MW