Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3 unique locations (74 components)

FORREST FARM, CALDERCRUIX, AIRDRIE, LANARKSHIRE, ML6 8NX (6 components)
• Cruachan pump storage hydro plant - Unit 3
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU component will comprise containerised gas engines, transformers, a swithgear building, gas kiosk, DNO switch room, and communications devices for control of the asset all in a compound secured by an acoustic fence.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Pierces Farm PV Palmers Lane Near Grazeley Burghfield Reading RG7 3AH (3 components)
• 0.25MW of demand reduction
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate, to export.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Loading map...
Showing 3 locations