DSR (Demand Side Response)

25 unique locations (876 components)

Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (16 components)
• Energy facility comprising of reciprocating engine sets.
• Existing Energy from Waste Plant
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
64.04 MW
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (13 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.00 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Newton Aycliffe CO Durham DL5 6EA (46 components)
• N/A
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
155.38 MW
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
236.69 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
151.50 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (25 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.88 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10.22 MW
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Ratcliffe Unit 4 coal-fired unit
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
148.93 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
ACS&T - Grimsby - Site 2, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (17 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.34 MW
ABP UK Shrewsbury, 1 Battlefield Rd, Shrewsbury SY1 4AH, United Kingdom (24 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Milling Motor Pelletizers, Fans etc
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.13 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
403.07 MW
Loading map...
Showing 25 locations